|
Name
EDUCATION
|
2009-2013
Universiti Teknologi MARA Shah Alam, Selangor.
Bachelor’s Degree (Hons.) Electronics
Engineering (Communication)
Current Semester: Semester 8 (Final semester), CGPA:
2008-2009
Kolej Matrikulasi Pahang.
Physical science,
CGPA:
2006-2007
Sekolah menengah Teknik Sultan Ahmad Shah Rompin
Pahang.
SPM ,:
EXPERIENCE
|
Assistant Project Manager
19 May 2015 – Present
Project Coordinator
26 March 2014 – 30 April 2015
|
Global
Security Network Sdn Bhd
·
Participate in site Meeting
and site walk with the Main Contractor.
·
Attend progress meeting and
consultant meeting.
·
Prepare and manage project documentation,
i.e. Daily and weekly work progress file all project documents (hard and soft
copies).
·
Day to day management of the
site including supervising and monitoring the site labor and work progress.
·
Resolve any unexpected
technical difficulties and others problem that may arise also need to prepare
the documentation/letter that related.
·
Involved in inspection of
work done for the security system such as Access card, CCTV, SMATV,PA system,
Intercom System and barrier gate that will be verify by Clark of Work( C.O.W)
·
Arrange for purchasing materials/equipment
that required at site and to ensure that all materials/equipment used and
work performed as per specification.
·
Responsible to find manpower
for installation of conceal conduit and lay cable and experience on the
installation of conduit and lay cable
·
Able to understand, checking
and produce shop drawings by using Draftsigth software.
·
Liaise with other
sub-contractor pertaining ELV system.
·
Produce milestone of the
project by referring to the master program form main contractor and planning
the work efficiently.
·
Work with minimum supervision
since the HQ in Kuala Lumpur, therefore Johor site is my full responsibility.
Mutiara
Teknologi (M) Sdn Bhd Selangor.
·
Participate in Project Team
Meetings, Payment Committee meeting.
·
Prepare minute of meeting, presentations
slide and reporting.
·
Prepare and manage project documentation,
i.e. Daily and weekly work progress file all project documents (hard and soft
copies).
·
Report and assist Project
Manager on project site coordination works to achieve the project target.
·
Monitor project timeframe
within tight schedules and follow up the outstanding project issue and will
initiate a meeting if necessary to resolve the issue as soon as possible.
·
Coordinate the delivery
submission/handover document to the customer.
·
Liaise with customer for
project matter from time to time.
·
Prepare the Delivery Note
(DN) and checking the invoices based on the Purchase Order (PO) and DN.
·
Well understand of the
technical part such as Information and Communication Technology (ICT)
division.
|
Network Support Engineer
9 December 2013-21 March 2014
|
Silverstreet
(M) Sdn. Bhd. Kuala Lumpur.
·
Main task as a First Line Support(FLS), single
point of contact with the user community. Responsible for day-to-day interaction
with customers, partners, account manager and R&D.
·
Manage incident via emails, calls, Instant
Messaging (IM) and provide high quality support. Addressing incident
efficiently, by gathering /logging all necessary information for
troubleshooting and resolve user's incident. Escalated incident and problems
that cannot be resolved within FLS to second Second Line (SLS) and R&D
depending on the incidents. Ensure that users are kept up to date on the
status of incident and problems.
·
Ensure incidents handled within the agreed Service-Level
Agreement (SLA)
|
Internship
16 July 2012 – 8 September 2012
|
Abbaco Control Sdn. Bhd. Selangor.
·
Learn and used AutoCAD drawing.
·
Discover and use basic Programmable Logic
Controller (PLC)
·
Design a PLC measurement current for the PLC
measurement
·
Design switchboard for the PLC configuration.
|
General Worker
February 2008-Jun 2009
|
Teleprima Sdn. Bhd. Selangor.
·
Install Microwave equipment
·
Maintenance of the microwave equipment
|
ENGINEERING
PROJECT
|
10 September
2012 – 21 June 2013
June 2009- July
2012
|
Final Year Project:
·
Design Monopole Antenna with DGS for WiMAX
application.
Objective:
·
To improve a monopole antenna and reduce the
size of monopole antenna.
Mini
Projects:
·
Design Low Noise Amplifier and Low Pass
Tchebyshev Filter.
·
Design of Front-Feed Parabolic Antenna and
Patch Antenna.
·
Design portable Humidity Sensor device.
·
Design microwave oven system.
|
SKILLS
|
Computer
Skills.
|
Communication Skill
|
EXTRA
CURRICULAR ACTIVITIES
|
Member of Kor Sukarelawan Polis Siswa and Siswi
(SUKSIS) UiTM Shah Alam.July 2009-Jul 2012.
·
Participated on expedition 111111, 30 Puncak,
1UiTM, 1Malaysia has written in The
Malaysia Book of Record.
·
Participated in 24 hours nonstop marching
written in The Malaysia Book of Record.
·
Participated in course leadership and team
building.
Member
of Jawatankuasa Perwakilan Blok (JPB). March 2012-july2012.
·
Organize committee on college registration.
Member
of volunteer officer police alumni club. (VOPAC). July 2012-July 2013.
·
Attend an organization's course/Kelab pelajar item
2012.
·
Participated on expedition Mendaki Gunung Datuk
Rembau.
REFERENCE
|
No comments:
Post a Comment